Castleconnell Flood Relief Scheme Logo

Project Area

The study area includes:

However, the focus of the scheme is the village centre which flooded in 2009, 2015 or 2020 or are predicted to flood in an extreme event.  This will focus on the boundary of the area for further assessment (AFA) as defined in the OPW’s CFRAM Study and shown in the map below.